The 48 axle heavy transport vehicle (4 PPU) transports cargo with a length of 72 meters, a width of 32 meters, a height of 16.5 meters, and a weight of more than 1,000 tons, and reaches the construction site safely.
One heavy transporter is used for windmill construction, the transporter loading capacity is around 150t. It is easy to transport the windmill tower sections and the nacelles.
More than 1000 tons wind power plant steel structure is transported by our SPMT system.The huge block is 22m in length, 22m in width and higher than 60m. The difficult work is well done.
Application of our SPMT transportation company super-heavy equipment transportation case
Professionally provides ultra-long, ultra-wide, ultra-high, Super-heavy equipment transportation
Large-scale transportation business of special logistics. Professional transportation engineering machinery and equipment transportation, large (precision) equipment,...
A group company transportation case Use our SPMT of 2x10 axle lines to transport a 475 tons base of crane.
The 20-axis hydraulic heavy-duty transport truck has the advantages that the cargo platform height can be adjusted, the cargo platform height can be adjusted to 0.7 m, the axle load is uniform, the turning radius is small, and the reversing is...
A customer of Xi’an used a Four-column flatbed truck combination SPMT to transport a chemical tank